Assignment: Read the questions carefully and answer each part.

1. As per the Sydney Tar Ponds Agency Element TP6C Tender document in Moodle, please respond to the following:

a. When is a Preconstruction Meeting to occur? Provide the section number and section title. Environmental Auditing Assignment

b. What product does the contractor need to apply for dust control on the site? Provide the section number and section title.

2. An as-built drawing is a revised drawing submitted by a contractor upon completion of a construction project. These drawings contain any changes made from the initial drawings during the construction process.

ORDER A PLAGIARISM-FREE PAPER HERE

a. In your opinion, why is it important that contractors are required to provide these as-built drawings after completion of a project?

b. Do you think that there needs to be a clause in the tender specifications to address as-built drawings?

3. Addenda captures revisions and modifications of key information during a tender and becomes part of the contract upon tender award. What items do you think could be included in an Addendum? Please specify three examples. Environmental Auditing Assignment